Name of Project

Water Supply System (SPAM) Lampung

Total Investment

Rp 1.1 Trillion

Description

SPAM Regional Lampung is a project of water supply which is planned by PDAM of Bandar Lampung City with the output of 500 Litre/Second.

Latest Status

Construction and will be operation in 2019

  1. Process of Feasibility Study Pre-review by Government Contracting Agency (PJPK) through the facilitation of PT. SMI
  2. Process to propose Water Retrieval and Utilization Permit (SIPPA)
  3. Process of land acquisition
  4. Focus Group Discussion and Public Seminar were held from 11 to 12 October 2016
  5. Until 23 December 2015, Procurement Committee had made an Official Report on the Result of Tender of Drinking Water Supply System (SPAM ) of Bandar Lampung City in relation to the absence of participant submitting offer document (the tender was declared failed)
  6. The initial plan with regard to the capacity, which was 500 L/second was declared not feasible. At present, PJPK is in the process of reviewing capacity increase and region expansion of services. The planned capacity is 750 L/second.
  7. Change of location leads to the need for land acquisition for reservoir.

Location

Lampung

Source Budget

Funding Scheme

Public-Private Partnership (PPP)

Project Owner

Regional Drinking Water Company (PDAM) Bandar Lampung City

Planned Commence Date

2018

Planned Commercial Operation

2020