Workforce Skill Certificate / SKTK Obtain Through the Certification and Registration Process:
Certification
Certification is a process of evaluating the competency and ability of one's professional skills in the field of construction services through a process of verification and validation by the Association and / or the National Construction Services Development Institute (LPJK).
Registration
Registration is an activity by the LPJK to determine the professional competence of workforce skills in accordance with the classification and qualifications which are realized in the form of certificates.
Certificate
A certificate or SKTK is a proof of recognition of a workforce competency skills issued by the National LPJK or Provincial LPJK through the certification process and registration of experts.
Classification and Sub-classification of Skilled Labor (Tenaga Terampil)
No. | Sub-Classification / Sub Bidang | Code No. |
1 | Draftman / Juru Gambar Arsitektur | 003 |
2 | Bricklayer / Bricklaying / Tukang Pasang Bata / Dinding (Tukang Bata) | 004 |
3 | Stone (Rubble) Mason / Tukang Pasang Batu (Tukang Bangunan Umum) | 005 |
4 | Plesterer / Solid Plesterer / Tukang Plesteran | 006 |
5 | Ceramic Tiles, Floor and Wall (Tukang Pasang Keramik, Lantai dan Dinding) | 007 |
6 | Floor Tiles / Tiles / Marble Plumbers (Tukang Pasang Lantai Tegel / Ubin / Marmer) | 008 |
7 | Carpenter / Tukang Kayu (Termasuk Kayu Bangunan) | 009 |
8 | Ceiling Fixer / Ceiling Fixing / Tukang Pasang Plafon | 011 |
9 | Gypsum Wall Mount Installer / Tukang Pasang Dinding Gypsum | 012 |
10 | Gypsum Ceiling Fixer / Tukang Pasang Plafon Gypsum | 013 |
11 | Building Painters / Tukang Cat Bangunan | 014 |
12 | Landscape / Tukang Taman | 015 |
13 | Plambing Work Field Implementer / Pelaksana Lapangan Pekerjaan Plambing | 016 |
14 | Multi-storey Building Maintenance Supervisor / Supervisor Perawatan Gedung Bertingkat | 017 |
15 | Carpenter / Tukang Pelitur Kayu | 018 |
16 | Tiered Doors and Windows / Tukang Kusen Pintu dan Jendela Bertingkat | 019 |
17 | Implementing Housing and Building Jobs / Pelaksana Lapangan Pekerjaan Perumahan dan Gedung | 020 |
18 | Implementing Field Work Finishing High-rise Building / Pelaksana Lapangan Pekerjaan Finishing Bangunan Gedung Bertingkat Tinggi | 021 |
19 | Building Implementers / Building Works / Pelaksana Bangunan Gedung / Pekerjaan Gedung | 022 |
20 | Implementing Housing / Settlement Buildings (Pelaksana Bangunan Perumahan / Pemukiman) | 023 |
21 | Building Supervisor / Pengawas Bangunan Gedung | 024 |
22 | Housing Building Supervisor / Pengawas Bangunan Perumahan | 025 |
23 | Park Steward / Pelaksana Penata Taman | 026 |
24 | Building Quantity Surveyor / Juru Ukur Kuantitas Bangunan Gedung | 027 |
25 | Quality Supervisor for the Implementation of Building Construction / Pengawas Mutu Pelaksanaan Konstruksi Bangunan Gedung | 028 |
26 | Landscape / Penata Taman | 029 |
27 | Implementing Associate Building Maintenance / Pelaksana Madya Perawatan Bangunan Gedung | 030 |
28 | Superintendent of Building Painters / Pengawas Tukang Cat Bangunan | 031 |
29 | Assistant for Ceiling Installation / Pembantu Pelaksana Pemasangan Plafon | 032 |
30 | Glass Technician / Teknisi Kaca | 033 |
31 | Partition Wall Installer / Pemasang Dinding Partisi | 034 |
No. | Sub-Classification / Sub Bidang | Code No. |
1 | Draftman / Juru Gambar – Sipil | 003 |
2 | Mapping Survey Engineer / Technician (Juru Ukur / Teknisi Survey Pemetaan) | 004 |
3 | Teknisi Laboratorium Jalan (Campuran Beton Beraspal) | 005 |
4 | Concrete Laboratory Technician / Teknisi Laboratorium Beton | 006 |
5 | Soil Laboratory Technician / Teknisi Laboratorium Tanah | 007 |
6 | Asphalt Laboratory Technician / Teknisi Laboratorium Aspal | 008 |
7 | Soil Investigation Operator / Operator Alat Penyelidikan Tanah | 009 |
8 | Fondation Work / Tukang Pekerjaan Pondasi | 010 |
9 | Earthmoving / Tukang Pekerjaan Tanah | 011 |
10 | Barbende / Bar bending / Tukang Besi-beton | 012 |
11 | Concretor / Concrete Operations / Tukang Cor Beton | 013 |
12 | Formworker / Formwork / Tukang Pasang Perancah | 014 |
13 | Scaffolder / Scaffolding / Tukang Pasang Scaffolding | 015 |
14 | Gas Pipe Fitter / Tukang Pasang Pipa Gas | 016 |
15 | Paving / Tukang Perkerasan Jalan | 017 |
16 | Tukang Pasang Konstruksi Rig / Piling Rigger / Rigger | 018 |
17 | Tukang “Boring” / Boring and Driving | 019 |
18 | Steel Workers / Tukang Pekerjaan Baja | 020 |
19 | Asphalt Road Workers / Pekerja Aspal Jalan | 021 |
20 | Foreman Hot Asphalt Mixed Production / Mandor Produksi Campuran Aspal Panas | 022 |
21 | Road Pavement Foreman / Mandor Perkerasan Jalan | 023 |
22 | Road and Bridge Work Technicians / Teknisi Pekerjaan Jalan dan Jembatan | 024 |
23 | Measuring Quantity for Road and Bridge Work / Juru Ukur Kuantitas Pekerjaan Jalan dan Jembatan | 025 |
24 | Iron Scaffolding / Tukang Perancah Besi | 026 |
25 | Steel & Plate Construction Workers (and Tower Pairs) / Tukang Konstruksi Baja & Plat (dan Tukang pasang menara) | 027 |
26 | Implementing Road Work Field / Pelaksana Lapangan Pekerjaan Jalan | 028 |
27 | Implementing Bridge Work Field / Pelaksana Lapangan Pekerjaan Jembatan | 029 |
28 | Implementing the Irrigation Work Field / Pelaksana Lapangan Pekerjaan Jaringan Irigasi | 030 |
29 | Implementing Irrigation Channels / Pelaksana Saluran Irigasi | 031 |
30 | Implementing Irrigation Building / Pelaksana Bangunan Irigrasi | 032 |
31 | Managing the Dam / Pelaksana Bendungan | 033 |
32 | Tunnel Implementers / Pelaksana Terowongan | 034 |
33 | Technician Calculates the Quantity of Water Resources Works / Teknisi Perhitung Kuantitas Pekerjaan Sumber Daya Air | 035 |
34 | Dam Inspector / Pengawas Bendungan | 036 |
35 | Irrigation Building Superintendent / Pengawas Bangunan Irigrasi | 037 |
36 | Irrigation Channel Supervisor / Pengawas Saluran Irigrasi | 038 |
37 | Road Employment Supervisor / Pengawas Lapangan Pekerjaan Jalan | 040 |
38 | Bridge Employment Supervisor / Pengawas Lapangan Pekerjaan Jembatan | 041 |
39 | Dredging Technician / Teknisi Pengerukan | 042 |
40 | Civil Engineering Survey Technician / Teknisi Survey Teknik Sipil | 043 |
41 | Implementing Bridge Work / Pelaksana Pekerjaan Jembatan | 044 |
42 | Implementing Road Works / Pelaksana Pekerjaan Jalan | 045 |
43 | Head of Road and Bridge Works Supervisor / Kepala Pengawas Pekerjaan Jalan dan Jembatan | 046 |
44 | Quantity Counters / Juru Hitung Kuantitas | 047 |
45 | Road / Bridge Work Measurer (Juru Ukur Pekerjaan Jalan / Jembatan) | 048 |
46 | Road / Bridge Work Quantity Engineer / Teknisi Penghitung Kuantitas Pekerjaan Jalan/Jembatan | 049 |
47 | Steel Erector of Bridge | 050 |
48 | Building Implementers / Building Works (Pelaksana Bangunan Gedung/Pekerjaan Gedung) | 051 |
49 | Implementing the Building Field Work / Pelaksana Lapangan Pekerjaan Gedung | 052 |
50 | Formwork Carpenter / Tukang Kayu Bekisting | 053 |
51 | Precast Concrete Installers / Tukang Pasang Beton Pra Cetak | 054 |
52 | Aluminum Frame Builder / Tukang Rangka Aluminium | 055 |
53 | Foreman Mounting Lightweight Steel Roof Truss / Mandor Pemasangan Rangka Atap Baja Ringan | 056 |
54 | Bridge Steel Frame Mounted Foreman / Mandor Pemasangan Rangka Baja Jembatan | 057 |
55 | Implementing the Steel Frame Bridge Installation Work / Pelaksana Lapangan Pekerjaan Pemasangan Jembatan Rangka Baja | 058 |
56 | Road and Bridge Work Drawing / Juru Gambar Pekerjaan Jalan dan Jembatan | 059 |
57 | Formworks (Tukang Bekisting (Acuan) dan Perancah Bidang Sumber Daya Air) | 060 |
58 | Asphalt Pavement Work Foreman / Mandor Pekerjaan Perkerasan Aspal | 061 |
59 | Precast Concrete Installer Foreman / Mandor Tukang Pasang Beton Precast | 062 |
60 | Road Laboratory Technician Assistant / Asisten Teknisi Laboratorium Jalan (Campuran Beton Beraspal) | 063 |
61 | Concrete Laboratory Technician Assistant / Asisten Teknisi Laboratorium Beton | 064 |
62 | Assistant for Soil Mechanics Laboratory Technicians / Asisten Teknisi Laboratorium Mekanika Tanah | 065 |
63 | Geotechnical Technician / Teknisi Geoteknik | 066 |
No. | Sub-Classification / Sub Bidang | Code No. |
1 | Draftman / Juru gambar – Mekanikal | 003 |
2 | Operator Buldozer | 004 |
3 | Operator Motor Grader | 005 |
4 | Operator Mesin Excavator | 006 |
5 | Operator Tangga Intake Dam | 007 |
6 | Operator Road Roller / Road Roller Paver Operator | 008 |
7 | Operator Wheel Loader | 009 |
8 | Operator Crowler Crane | 010 |
9 | Operator Rough Terrain Crane | 011 |
10 | Operator Truck Mounted Crane | 012 |
11 | Operator Tower Crane | 013 |
12 | Operator Wheel Crane | 014 |
13 | Operator Backhoe | 015 |
14 | Operator Pile Hammer | 016 |
15 | Operator Mobil Pengaduk Beton | 017 |
16 | Operator Crawler Tractor Bulldozer | 018 |
17 | Operator Dump Truck | 019 |
18 | Operator Forklif | 020 |
19 | Operator Specialized Equipment Plant | 021 |
20 | Operator Mobile Elevating Work Platform | 022 |
21 | Operator Concrete Pump Equipment | 023 |
22 | Operator Slinging & Rigging Operator | 024 |
23 | Drilling Machine Operators / Operator Mesin Bor | 025 |
24 | Lathe Operators / Operator Mesin Bubut | 026 |
25 | Heavy Equipment Mechanics / Mekanik Alat-Alat Berat | 027 |
26 | Tukang Las / Welder / Gas & Electric Welder | 028 |
27 | Turner / Tukang Bubut/Mesin Pemangkas | 029 |
28 | Asphalt Mixing Machine Operator / Operator Mesin Pencampur Aspal | 030 |
29 | Operator Aspal Paver / Operator Mesin Penggelar Aspal | 031 |
30 | Asphalt Sprayer Operator / Operator Mesin Penyemprot Aspal | 032 |
31 | Hotmix Production Executor / Pelaksana Produksi Hotmix | 033 |
32 | Sheep Foot Vibrating Compactor Operator | 034 |
33 | Juru Las Oxyacetylene | 035 |
34 | Precision Sawing Machine Operators / Operator Mesin Gergaji Presisi | 036 |
35 | Crane Operators / Operator Mesin Derek | 037 |
36 | Pipe Fittings / Tukang Pasang Pipa | 038 |
37 | Plate and Pipe Construction Welder / Tukang Las Konstruksi Plat dan Pipa | 039 |
38 | MID (CO2) Welder / Tukang Las MID (CO2) Posisi Bawah Tangan | 040 |
39 | TIG Welder / Tukang Las TIG Posisi Bawah Tangan | 041 |
40 | Wood Lathe Operators / Operator Mesin Bubut Kayu | 042 |
41 | Oil Drilling Operators / Operator Pengeboran Minyak | 043 |
42 | Implementing Field ME Work High-rise Building / Pelaksana Lapangan Pekerjaan ME Bangunan Gedung Bertingkat Tinggi | 044 |
43 | Implementing Field Employment Setting Out Multi-storey Buildings / Pelaksana Lapangan Pekerjaan Setting Out Bangunan Gedung Bertingkat | 045 |
44 | Grader Machine Operators / Operator Mesin Grader | 046 |
45 | Stone Crusher Machine Operator / Operator Mesin Pemecah Batu | 047 |
46 | Maintenance of Vertical Transportation System / Pelaksana Perawatan Instalasi Sistem Transportasi Vertikal Dalam Gedung | 048 |
47 | Concrete Paver Operator (Operator Mesin Penghampar Beton Semen) | 049 |
48 | Operator Cold Miling Machine | 050 |
49 | Electric Welder / Tukang Las Listrik | 051 |
50 | Tower Crane Mechanics / Mekanik Tower Crane | 052 |
51 | Operator Batching Plant | 053 |
52 | Mechanical Hot Asphalt Mixture / Mekanik Campuran Aspal Panas | 054 |
53 | Mekanik Heating Ventilation dan Air Condition (HVAC) | 055 |
54 | Gondola Operators / Operator Gondola Pada Bangunan Gedung | 056 |
55 | Fire Alarm Technician / Teknisi Fire Alarm | 057 |
56 | Dredger Mechanics / Mekanik Kapal Keruk | 058 |
57 | Heavy Equipment Engine Mechanics / Mekanik Engine Alat Berat | 059 |
No. | Sub-Classification / Sub Bidang | Code No. |
1 | Lighting and Power Phase One Technician / Teknisi Instalasi Penerangan Dan Daya Fasa Satu | 021 |
2 | Lighting and Power Triple Installation Technicians / Teknisi Instalasi Penerangan dan Daya Fasa Tiga | 022 |
3 | Lightning Protection System Installation Technician / Teknisi Instalasi Sistem Penangkal Petir | 024 |
4 | Programmed Control Installation Technician (PLC Based) / Teknisi Instalasi Kontrol Terprogram ( Berbasis PLC ) | 055 |
5 | Industrial Automation Installation Technician / Teknisi Instalasi Otomasi Industri | 057 |
6 | Electric Motorbike Installation, Control and Instrument Technicians / Teknisi Instalasi Motor Listrik, Kontrol dan Instrumen | 058 |
7 | Measuring and Limiting Installation Technicians / Teknisi Instalasi Alat Pengukur dan Pembatas ( APP ) | 059 |
8 | Low Voltage Network Installation Technician / Teknisi Instalasi Jaringan Tegangan Rendah ( JTR ) | 060 |
9 | Teknisi Instalasi Jaringan Tegangan Menengah / Medium Voltage Network (JTM) Installation Technician | 061 |
No. | Sub-Classification / Sub Bidang | Code No. |
1 | Plumbing Implementation (Pelaksana / Pekerjaan Plambing) | 001 |
2 | Plumbing Supervisor (Pengawas / Pekerjaan Plambing) | 002 |
3 | Photographer / Draftman (Juru gambar / Draftman – Tata lingkungan) | 003 |
4 | Tukang Sanitary | 004 |
5 | Tukang Pipa Air / Plumber | 005 |
6 | Gas Plumbers / Tukang Pipa Gas | 006 |
7 | Building Plumbers / Tukang Pipa Bangunan | 007 |
8 | Plumber / Tukang Pipa | 008 |
9 | Groundwater Drilling Officer / Juru Pengeboran Air Tanah | 009 |
10 | Implementing Clean Water Pipelines / Pelaksana Perpipaan Air Bersih | 011 |
11 | Pelaksana Pembuatan Fasilitas Sampah dan Limbah / Implementing the Making of Garbage and Waste Facilities | 012 |
12 | Implementing Groundwater Drilling / Pelaksana Pengeboran Air Tanah | 013 |
13 | Clean Water Pipeline Supervisor / Pengawas Perpipaan Air Bersih | 014 |
14 | Groundwater Drilling Supervisor / Pengawas Pengeboran Air Tanah | 015 |
15 | Plumber / Tukang Plambing | 016 |
16 | Plambing Foreman / Mandor Plambing | 017 |
17 | Drinking Water Quality Testing / Pelaksana Pengujian Kualitas Air Minum SPAM | 018 |
18 | Implementing the Installation of Sluice / Pelaksana Pemasangan Pintu Air | 019 |
19 | Field Implementing Middle Water Pipeline / Pelaksana Lapangan Perpipaan Air Madya | 020 |
20 | Implementing Field Piping Works / Pelaksana Lapangan TK II Pekerjaan Perpipaan | 021 |
21 | Implementing Leachate Pipeline / Pelaksana Pemasangan Pipa Leachate (Lindo dan Gas di TPA) | 022 |
22 | Implementing Residential Waste Building Works / Pelaksana Pekerjaan Bangunan Limbah Permukiman | 023 |
23 | Implementing Water Resistant Layers at the TPA Processor Site / Pelaksana Pekerjaan Lapisan Kedap Air Ditempat Pemproses TPA | 024 |
24 | Sondir Technician / Teknisi Sondir | 025 |
25 | Engineering Geology Technician / Teknisi Geologi Teknik | 026 |
Get a Quote for SKTK Certificate in Indonesia
Kindly fill in the form below, our consultant will get in touch as soonest.
Alternatively you can call at +62 815 629 0000 or email to [email protected]
South Quarter, Tower B, Mezzanine Level, Jl. R.A. Kartini Kav. 8, RT.10/RW.4, Cilandak, Jakarta 12430
Ph: +62 815 629 0000
Payment :
Follow us :